V. 2012 – 2017 Master Plan Current Issues: 12. LeBow Engineering Center – Microfabrication Lab

Updated 8.8.13. Construction on the LeBow Engineering Center’s Microfabrication Lab is progressing beautifully. Take a look at the photos below and compare them to those from the May 13th post!

IMG_7110 IMG_7111

Updated 5.13.13. The renovation of the LeBow Engineering Center’s Microfabrication Lab is now in full swing. The space has been demoed and construction will begin shortly.

IMG_6774 IMG_6775 IMG_6777

Updated 3.20.13. The Microfabrication Lab at Drexel’s LeBow Engineering Center will soon undergo construction that will result in a newly-updated, state-of-the-art lab containing Class 100 to Class 1000 cleanrooms.

Below are photos of the Microfabrication Lab prior to construction:

IMG_6222 IMG_6225

IMG_6224 IMG_6223

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s